PROJECT DESCRIPTION

  • This project for the Air Force includes a 5,000 FF addition which adds a fitness room, two bathrooms, a mechanical room and multiple storage closets.
  • Renovations to the exterior included new roof, new siding, new windows, and new exterior porch overhangs.
  • New underground utilities and fire lines were added to compensate for the new space and sprinkler system (inside and outside).
  • Architect: Noelker and Hull Associates, Inc.
  • Construction timeframe: 270 days

DESIGN FEATURES

  • The Community Center inside of the Air Force Enlisted Village, remained open and operational throughout the duration of the project.
  • Wide range of materials used for construction including structural steel, wood trusses, structural CMU, metal stud framing, fiber cement board, brick and spray foam insulation.