Project Details

  
UNIVERSITY OF WEST FLORIDA CYBERSECURITY OFFICES
Interior Build-out


"Bear General Contractors exceeded our expectations in building a state-of-the-art cybersecurity facility. They demonstrated flexibility in accommodating our requirements and delivered as promised in a timely manner. Their professionalism and attention to detail turned our vision into a reality. Thank you!"

— Dr. Eman El-Sheikh,
UWF Center for Cybersecurity Director

PROJECT DESCRIPTION

  • The 9,000 SF UWF Cybersecurity offices are located on the entire 2nd floor of the SCI Tower.
  • The existing 2nd floor was completely “gutted”, and all new walls, bathrooms, and mechanical/electrical systems were installed, tied into existing building systems.
  • This project included new construction and renovation
  • Architect: Caldwell and Associates Architects
  • Constructed in 120 days

DESIGN FEATURES

  • 85% of the interior walls are glass
  • High-tech communications and security systems installed.
  • Dedicated server room installed to house all the computer servers and racks.

SERVER ROOM

  • The server room required individual HVAC units installed on the 3rd floor roof of the SCI Tower separate from the building HVAC systems and includes a designated fire suppression system.
  • Structured communications cabling throughout the floor space supports computer servers.




Copyright 2019 by Bear General Contractors | Privacy Statement | Login | Web Design by: BIS Designs